New construction Simmental Arena, Zweisimmen

2018

The Simmental Arena, the new multifunctional hall in Zweisimmen, is largely made of Swiss wood. What's more, it does not require any interior supports at all. The roof is supported by ten 38-meter-long arched trusses.

Facts and images
Construction Data
Involved
Spacious: The new hall can accommodate 2,000 people.
Spacious: The new hall can accommodate 2,000 people.
The Simmental Arena gallery: view of the arch trusses
The Simmental Arena gallery: view of the arch trusses
The building is almost entirely made of local wood and bears the Swiss wood origin mark (HSH)
The building is almost entirely made of local wood and bears the Swiss wood origin mark (HSH)
Also has room in the hall: fire department magazine including emergency vehicles
Also has room in the hall: fire department magazine including emergency vehicles
Detail of the large and heavy wooden arch trusses
Detail of the large and heavy wooden arch trusses

The project
The Simmental Arena was built to replace the old Zweisimmen Fair Hall. It is an event and market hall in one, is a place for markets and events of all kinds and houses the fire department magazine. The construction method basement and floor slab are made of concrete, the hall is a pure timber construction and consists mainly of wood from Switzerland. The hall is 80 meters long, the supporting structure of the roof consists of ten curved glulam beams up to 38 meters long, each weighing around 10 tons. The girders are around 2.40 meters high and over 20 centimeters wide - for a good reason: the hall does not need any supports at all on the inside. The girders span from outer wall to outer wall and bear the weight of the roof; a roof, it should be noted, that has to support a photovoltaic system and a lot of snow in winter. Timbatec was responsible for the design planning, structural analysis, earthquake bracing and fire protection planning for the hall.

The challenge
In the area of the fire station, there are only gates along almost the entire length, and there are no bracing elements - a major challenge in terms of earthquake bracing. The bracing is therefore provided by the wall panels of the market hall. The large bracing forces are transferred to the wall panels of the market hall via the roof panel of the fire station. Another challenge: fire protection. Special measures with regard to fire protection were required in particular for the fire department's fuel storage area. In this area, the fire resistance was increased and the walls were designed in such a way that in the event of an explosion, no damage could occur to the primary load-bearing components. The event hall is limited to an occupancy of 2000 people. Therefore, it was sufficient to install simple smoke and heat vents in the roof. A complex smoke simulation with subsequent hot smoke tests could be dispensed with.

Construction Data

- Structural timber 863 m3

- Cross laminated timber 102 m3

- OSB boards 5400 m2

- Facade formwork 2000 m2


Services of Timbatec

- SIA phase 31 preliminary project

- Cost estimate

- SIA Phase 32 Construction project

- Fire protection planning

- Site supervision and site inspections

- Structural analysis and design

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 Implementation project

- Fire protection: QA responsibility

- Specialist planner for structural fire protection

- Specialist planner for fire protection in timber construction

Client
Community Zweisimmen


Architect
Germann Architektur AG
3778 Schönried


Timber construction
ARGE Holzbau Zweisimmen Kunz/Schletti, 3770 Zweisimmen


Civil engineer
Haldi Design AG, 3778 Schönried


Electrical engineer
ogiplan elektroplanung + lichtdesign, 3780 Gstaad


HVAC engineer
H&K Planungs AG, 3600 Thun


Timber construction engineer
Timbatec Holzbauingenieure AG



Datenschutzhinweis

Diese Webseite nutzt externe Komponenten welche dazu genutzt werden können, Daten über Ihr Verhalten zu sammeln.

Notwendige Cookies werden immer geladen