Access bridge museum, Murten

2017

Forty years after its construction, the pedestrian bridge leading to the Murten Museum was no longer in good condition and needed to be replaced. The new passerelle, designed by Timbatec, is made of durable larch wood from Swiss forests.

Facts and images
Construction Data
Involved
Schoolroom EGThe new bridge from an Afar
Schoolroom EGThe new bridge from an Afar
The wooden bridge provides direct access to the museum rooms
The wooden bridge provides direct access to the museum rooms
The structure weighting of several tons was delivered ready to drive by a semitrailer truck
The structure weighting of several tons was delivered ready to drive by a semitrailer truck
A crane lifted the 10.5 meter long bridge into place
A crane lifted the 10.5 meter long bridge into place
The new bridge was clamped into the existing abutment niche
The new bridge was clamped into the existing abutment niche

The project
The story: In 1978, the Museum of Murten moved into a listed mill located on a slope not far from the lakeshore and the old town. To allow visitors direct access to the museum rooms on the upper floors of the mill, a wooden access bridge was built. However, the nearly forty years under the open sky have taken their toll on the bridge. The wooden structure had developed rot due to structural defects and therefore had to be additionally reinforced two years ago. In addition, the parapet, with a height of only 90 centimeters, no longer met current safety standards. The municipality of Murten therefore decided to replace the crossing.

The construction
The new bridge is made of block-glued Swiss larch wood. Larch is a very durable wood with good structural wood preservation, making it ideal for outdoor use. The new museum bridge was practically ready assembled at the timber builder. The 10.5-meter-long, 3.4-ton bridge was transported to the museum by a semitrailer truck and assembled there within a few hours.

The challenge
Unlike the old one, the new bridge was no longer attached to the wooden structure of the old mill's arbor. But: In order to preserve the old structure, it was mounted completely detached from the building. As a result, the bridge has neither a vertical nor a horizontal support for lateral bracing at one end. It therefore had to be clamped to the abutment on the slope.

Construction Data

- Glulam larch 2 m3

- Area floor grate larch 16 m2

- Larch staves railing 1

- 3 m3


Services of Timbatec

- SIA phase 31 preliminary project

- Cost estimate

- SIA Phase 32 Construction project

- Technical site supervision and site inspections

- Structural analysis and design

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 Implementation project

Timber construction engineer
Timbatec Holzbauingenieure Schweiz AG, Bern
3012 Bern


Client
City of Murten
3280 Murten


Timberconstructor
Gutknecht Holzbau AG
3280 Murten