Industrial hall TSUGAMI, Delémont

With its new building, TSUGAMI NP Swiss is focusing on an aesthetic wooden hall. This forward-looking and sustainable construction blends into the landscape of the Delémont Valley.

Facts and images
Construction Data
Involved
The hall is being built on the foundation slab floor
The hall is being built on the foundation slab floor
Interior view of the office area
Interior view of the office area
Interior view of the exhibition hall
Interior view of the exhibition hall
TSUGAMI | Development of high-precision machine tools
TSUGAMI | Development of high-precision machine tools
Construction of the hall ceiling
Construction of the hall ceiling

The project
The new hall covers an area of 46 x 23 meters and combines several functions under one roof: a showroom, an administrative area with modern offices, and a storage and preparation area for machines. This well-thought-out room layout enables TSUGAMI to efficiently map all business processes on one level. The wooden construction of the building not only ensures a particularly high load-bearing capacity and long service life, but also provides a remarkable aesthetic that has a positive effect on the indoor climate.

The construction method
Wood is omnipresent in this hall. Double-sloped glulam beams, which adapt to the roof slopes, rest on three rows of wooden posts. The floors in the office area and the roof are made of CLT laid on beams. The floor beams are supported by double joists. The interior and exterior walls are made of a wooden frame construction.

The challenge
Avoiding impacts was an important consideration in this project. The idea was to avoid adding any blocking elements or increasing the cross-sections of the posts too much. The construction system was therefore designed so that the rest of the structure could compensate for the loss of a post.

Construction Data

- BSH volume: 160m3

- Glulam panel area: 1320m2


Construction costs

- Total cost: approx. 4 million Swiss francs


Services of Timbatec

- SIA Phase 31 Preliminary project

- SIA Phase 32 Construction project

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 Execution project

- SIA Phase 52 Execution

- Statics and construction

- Specialist fire protection planning

- Cost estimate

- Specialist planning building physics

Architect
Stähelin Partner Architectes SA
2800 Delémont


Client
Tsugami Np Swiss
2800 Delémont


Timber construction
Batipro SA
2882 St-Ursanne