New construction housing estate Watt, Regensdorf

2010

The development in the Minergie-P Eco standard is designed as a zero-energy housing estate and consists of 2 multi-family houses and 7 terraced single-family houses. The entire settlement is built from the first floor in timber construction.

Facts and images
Construction Data
Involved
Articles
Stairs detail
Stairs detail
Residential complex with courtyard
Residential complex with courtyard
Entrance to the underground car park
Entrance to the underground car park
View 3
View 3
View 2
View 2

The project
The settlement House A / apartment house, duplex apartments, 4 floors House B / multi-family house, maisonette apartments, 4 floors House C+ D / terraced houses, 2 floors Total: 12 apartments and 7 terraced houses

The construction method
Interior and exterior walls in large-format, prefabricated wooden elements. The supporting structure is realized in timber frame construction. The building envelopes have an insulation thickness of 35 cm (U-value = 0.1 W/m2K). The ceilings are constructed of a special wood-concrete ceiling system with wood triple-layer panels visible below. The facade consists of horizontal larch wood lathing.



Construction Data

- Wooden construction

- Minergie-P Eco2

- REFH

- 2 MFH


Services of Timbatec

- SIA phase 31 preliminary project

- Cost estimate

- SIA Phase 32 Construction project

- Statics and construction

- Fire protection planning

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 Implementation project

- Technical site management and site inspections

Timber contractor
Hector Egger Holzbau AG
4900 Langenthal


Architect
Kämpfen für Architektur AG
8048 Zurich






Datenschutzhinweis

Diese Webseite nutzt externe Komponenten welche dazu genutzt werden können, Daten über Ihr Verhalten zu sammeln.

Notwendige Cookies werden immer geladen