The project
The work To improve the energy efficiency of the facade, all balconies and projecting window jambs were cut back flush with the facade. The prefabricated new facade elements were then attached in front of these.
The construction
In addition to windows and blinds, these also include the entire new building technology as a novelty. The new balconies were rebuilt as self-supporting steel-concrete structures in front of the facade. This object has won a solar prize in 2010.
Construction Data
- Standard Minergie-P
Services of Timbatec
- SIA phase 31 preliminary project
- Cost estimate
- SIA Phase 32 Construction project
- Structural analysis and design
- SIA Phase 41 Tendering and comparison of offers
- SIA Phase 51 Implementation project
- Site supervision and site inspections
- Dimensioning of prefabricated reinforced concrete slabs for balconies and bay windows
Timber construction contractor
Bächi Holzbau AG
8424 Embrach
Architect
Kämpfen für Architektur AG
8048 Zurich