Car shelter settlement road, Thun

1996

The architects envisioned a wooden slab laid over two steel girders - with a span of 4.50 meters. The plate was to be no more than about 4 cm thick and covered with greenery. This was not feasible, because with a construction less than 110 mm thick, the deflection would have been too great. But such a thickness would have been neither aesthetically nor economically satisfactory.

Facts and images
Construction Data
Involved

The project


The construction


Construction Data

- Sawn timber kiln-dried 12 % 4.4 m3

- 3-layer boards 19 mm 480 m2

- Covered area 240 m2


Construction costs

- Composite girder Fr. 105/m2


Timber construction contractor
Boss Holzbau AG
3600 Thun


Owner
GEBAWO Cooperative for Building and Living
3600 Thun


Construction management
Müller + Messerli Architekten
3600 Thun


Architect
Metron Architekten
5200 Brugg


Timber construction engineer
Stefan Zöllig c/o Boss Holzbau AG
3600 Thun



Datenschutzhinweis

Diese Webseite nutzt externe Komponenten welche dazu genutzt werden können, Daten über Ihr Verhalten zu sammeln.

Notwendige Cookies werden immer geladen