Addition of another storey to MFH Schäfligraben, Wallisellen

2020

The Schäfligraben development in Wallisellen consists of three apartment buildings. With the increase in wood up to additional two floors, 15 new bright apartments in wood, with exposed wood ceiling, have been created.

Facts and images
Construction Data
Involved
View kitchen
View kitchen
Connection of flat roof to existing exterior wall
Connection of flat roof to existing exterior wall
Connection floor ceiling - terrace to outer wall
Connection floor ceiling - terrace to outer wall

The project
The addition to the existing buildings was made in a light and modern wooden construction. Inside, the wooden ceilings are visible, otherwise the wood remains structurally active. However, hidden and outside is finished with a new clinker facade. This facade is attached to the wooden structure for stabilization. The visible wooden ceiling is made of horizontal glulam. The existing part of the building was extensively renovated. This included the renewal of the facade, renovation of the wet cells and the addition of a lift to the staircase. New, larger balconies in steel, which are anchored back to the existing building and the wooden structure, provide the apartments with more outdoor space.

The construction
The existing buildings were constructed in solid concrete. Consequently, the alterations in the stairwell with the integration of the new elevator also had to be built in reinforced concrete. The extension was built as a timber frame construction with visible glulam ceilings. Externally, the old balconies were replaced by new ones in steel, which were attached to the existing structure and the timber frame. The new clinker facade also had to be back-fastened to the wooden structure.

The challenge
The exterior wall in wood is located in the insulation level and thus offset from the exterior wall of the existing solid construction. This meant that a support had to be created for the wooden exterior walls and at the same time the tolerances of the solid construction had to be accommodated. The support had to be designed in a statically more complex way, since the concrete edge could not absorb the loads.

Construction Data

- Glulam: about 250 m3

- Building height: about 11 m

- New apartments in wood: 16


Construction costs

- BKP 214: CHF 750'000.-


Services of Timbatec

- SIA Phase 31 Preliminary design

- SIA Phase 32 Construction project

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 Implementation project

- SIA Phase 52 Execution

- Statics and construction

- Cost estimate

Client
Reishauer Foundation
8304 Wallisellen


Architect
Gutknecht Jäger Architektur GmbH
8045 Zurich


Timberconstruction engineer
Timbatec Holzbauingenieure (Schweiz) AG Zurich
8005 Zurich


Timberconstruction
STRABAG AG, Lindau
8315 Lindau/ZH


Civil engineer
Dr. J. Grob & Partner AG
8400 Winterthur


Building physics
Zehnder + Kälin AG
8400 Winterthur


Construction management
Gutknecht Jäger Architektur GmbH
8045 Zurich


Photography
Urs Bigler
8032 Zurich


Category
NameParticipant
3000Bern


Datenschutzhinweis

Diese Webseite nutzt externe Komponenten welche dazu genutzt werden können, Daten über Ihr Verhalten zu sammeln.

Notwendige Cookies werden immer geladen